Engineering Texas Magazine Features Mbroh’s Award-Winning Solutions for NTMWD Plant
Mbroh Engineering’s award-winning electrical design for the North Texas Municipal Water District’s Wilson Creek Regional Wastewater Treatment Plant is featured in the summer issue of ACEC Texas’ Engineering Magazine. The project won Gold in the Energy Category, winning top honors and advancing to the national competition this year.
The team’s design included a new power yard with a main medium voltage paralleling switchgear that parallels multiple medium voltage generators with two electrical utility power services. This project is one of NTMWD’s largest electrical generation systems at this time that parallels with a power company and provides plant-wide power reliability. The project provides a fully redundant power source plant-wide via overhead distribution.
Read more about the project and recent press at the links below: