5-Mile Junction Structure
The Mbroh team provided Instrumentation & Controls (I&C) engineering design services for this project. This included an operationally critical 60-inch pipeline controlling dry and wet weather flows to the Central Wastewater Treatment Plant (WWTP) and the Southside WWTP. The I&C design included RTU design, junction structure level monitoring, junction structure flow monitoring, and remote monitoring and control capability.