FY2015 Storm Water Pump Station & Flood Warning System Improvements

Client: City of Houston

Location: City of Houston

Cost: N/A

Service Category: Electrical Engineering; Instrumentation & Controls Engineering

Mbroh provided electrical and I&C assessment of the City of Houston’s Storm Water Pump Station (SWPS) and Flood Warning Systems (FWS). The team’s services extended to 33 locations during Pre-Phase I of the project. Overall, Mbroh led development of a technical memorandum to aid the City in evaluating and designing the SWPS and FWS with aspects that included: FWS design criteria and options, SWPS electrical and I&C specifications, wireless path survey for WiMAX communication network, and SCADA related assets.

Services covered 33 locations across the City of Houston

Updated the City’s standard specifications for SWPS and FWS