Bois d’Arc – Leonard Water Treatment Plant
Construction on the Leonard Water Treatment Plant started in Fall 2018. “Raw” or untreated water from Bois d’Arc Lake will enter the treatment plant after traveling southwest through 35 miles of pipeline. The water will be treated using state-of-the-art ozone and biological filtration technology. Mbroh is providing on-site resident representative services during construction of the water treatment plant. The team’s role is to provide resident inspector services for all electrical and SCADA components associated with the water treatment plant. The tasks include preparing daily construction reports with documentation of on-site observations and tracking corrections of defective work using the District’s standard forms. The team is also reviewing quality related documents provided by the Contractor such as test reports, equipment installation reports and required construction contract documents. In addition, Mbroh’s inspectors will assist with project completion activities and observe completed construction conditions for general conformance with the design concept, followed by preparation of a deficiencies list for contractor correction prior to final payment.
The Bois d’Arc Lake Water Supply Program, a monumental effort between dozens of firms across Texas, has received numerous industry accolades.
- 2024 Gold Medal (Water Resources Category), ACEC Texas
- 2024 Engineering Excellence Honor Award, ACEC National
- 2024 Project of the Year and Project Achievement Award (Water/Wastewater Projects over $50 million), Construction Management Association of America-North Texas Chapter
- 2024 Public Works Project of the Year (Structures Category-more than $75 million), American Public Works Association
- 2024 Texas Outstanding Civil Engineering Achievement Award, American Society of Civil Engineers-Texas Section
- 2023 Project of the Year, American Public Works Association-Texas Chapter