Integrated Pipeline (IPL) Program – Reservoir Design
The Integrated Pipeline (IPL) is a $2 billion program consisting of approximately 150 miles of pipeline, multiple lake pump stations, booster pump stations and balancing reservoirs. The pipeline will convey 350 MGD of raw water from Lake Palestine to Lake Benbrook, with connections to Cedar Creek Reservoir, Richland Chambers Reservoir and a Dallas delivery point.
Mbroh provided electrical and I&C services in support of the following reservoir design:
Joint Booster Pump Station #1 Suction Reservoir (JB2R)
Joint Booster Pump Station #2 Suction Reservoir (JB3R)