Joint Booster Pump Station #1 Suction Reservoir (JB2R)

Client: Tarrant Regional Water District

Location: Near Corsicana, Texas

Cost: $10-$20M

Service Category: Electrical Engineering; Instrumentation & Controls Engineering

Joint Booster Pump Station #1 Suction Reservoir (JB2R) consisted of four 40 MG earthen embankment reservoir cells located along the 350 MGD raw water transmission pipeline system. Mbroh was responsible for providing electrical design associated with lighting, security cameras and sump pumps for the underdrain system. The design also included remote monitoring of basic instrumentation, including piezometers, high water level and SCADA design coordination.

Coordination with the local power utility for connecting power source to lighting, cameras, pumps, and any other electrical components associated with the reservoir

Security cameras design for reservoir crest location