Mbroh provided SCADA, electrical and instrumentation design to support rehabilitation of the Plano Road Elevated Storage Tank (EST). The team’s proposed improvements included a new 2 MG composite EST with appurtenances, piping, valves, electrical, instrumentation, controls and SCADA. In addition, site security improvements included fencing, gates, access control, cameras, lighting, and intrusion alarms plus connectivity to the City’s installed network equipment.

Overall improvements provided by Mbroh included a motion sensor light control in the pump station, stairs, pump vault, and meter vault.

Rehabilitation services at elevated storage tanks included design improvements, security upgrades and security improvements

Also provided engineering services during construction

SCADA services included radio path survey