Vista Ridge Integration Pipeline

Client: San Antonio Water System (SAWS)

Location: San Antonio, Texas

Cost: $500M-$1B

Service Category: Electrical Engineering

The Vista Ridge Pipeline is a 142-mile water project providing the largest non-Edwards Aquifer supply in the City’s history. The project consists of new delivery point treatment facilities, new ground storage tanks, new high service pumping station, new transmission pipelines, upgrades to existing pipelines, upgrades to existing pumping stations (including piping, control valves, pump replacement and SCADA), instrumentation and rehabilitation/replacement of existing pipelines.

Mbroh provided professional services as a member of the owner’s representative consulting team for the Vista Ridge Integration Project. Mbroh was responsible for the evaluations of the existing Bitters and Maltsberger Pump Stations to determine the ability of the existing electrical infrastructure to accommodate new loads required by this project. The scope of service included preliminary engineering design and criteria package development.

Assisted in the electrical procurement of the Design-Build Contractor