Portfolio

Mbroh serves as an integrated advisor for clients across Texas and Oklahoma. We offer a full range of electrical, instrumentation and control (I&C), SCADA, automation, and MEP engineering services for water, wastewater and industrial plants; port facilities; transit systems; airports; and commercial complexes. Mbroh’s design services combined with on-site construction management capabilities provide clients with unique benefits – exceptional quality assurance and quality control, below-average change orders, cost and schedule savings, and the ability to successfully bring project designs to fruition. Projects range from short-term solutions to complex, ongoing programs, all with a common focus: Giving You the Power to Deliver!

Show:

All Construction Management & Inspection Electrical Engineering Instrumentation & Controls Engineering SCADA & Automation Transportation
  • Northeast 23rd Street Resurfacing and Enhancements

  • FM-543 Realignment from US-75 to Hardin Boulevard

  • DCRWS Heat Tracing & Insulation

  • Apollo Pump Station Improvements

  • Audit Team On-Call Services: Safety Oversight Review

  • MC-5&6 Phase 2A Meter Station

  • 5-Mile Junction Structure

  • Activated Sludge Influent Pump Station at Central Wastewater Treatment Plant

  • Draper Water Treatment Plant Improvement

  • City of Pflugerville Water Treatment Plant Expansion

  • City of Galveston Airport Pump Station

  • Fulton Street Reconstruction from Quitman to Hogan Street Design Services

  • Sister Grove Regional Water Resource Recovery Facility (RWRRF)

  • DWU Wastewater Facilities Safety and Security Project

  • Traffic Signal Management Program/Intelligent Traffic Systems

  • On-Demand Engineering Services for Strategic Asset & Performance Management (SAPM)

  • Shoulder Resurfacing and Guardrail Rehabilitation

  • Automation Upgrade

  • SCADA Cyber Security Enhancement

  • Water Distribution System Energy and Water Quality Management System Study

  • Bois d’Arc – Creek Reservoir Pump Station

  • Bois d’Arc – Leonard Water Treatment Plant High Service Pump Station

  • Bois d’Arc – Leonard Water Treatment Plant

  • FY2015 Storm Water Pump Station & Flood Warning System Improvements

  • South Mesquite Creek RWWTP Filter and Ultraviolet Disinfection Improvements

  • Rowlett Creek and Lower Cottonwood Creek Lift Station Improvements

  • Stewart Creek West WWTP Expansion to 10 MGD

  • Hurricane Harvey Disaster Mitigation for Wastewater Facilities in the Almeda Sims Area

  • Village Creek Reclamation Facility Miscellaneous Switchgear Replacement

  • Vista Ridge Integration Pipeline

  • District Cooling Plant 1 Cooling Tower Expansion

  • Kennedale Balancing Reservoir (KBR) Expansion

  • Midlothian Balancing Reservoir (MBR)

  • Joint Booster Pump Station #2 Suction Reservoir (JB3R)

  • Joint Booster Pump Station #1 Suction Reservoir (JB2R)

  • Integrated Pipeline (IPL) Program – Reservoir Design

  • Capers Ridge Pump Station Luce Bayou Project (LBP)

  • Surface Water Supply Project (SWSP)

  • Northeast Water Purification Plant (NEWPP) Expansion Project

  • Regional Water Supply Program

  • Rehabilitation of Plano Road Water Storage Tanks

  • Walsh Ranch Pump Station Improvements

  • South Mesquite Creek RWWTP Electrical Improvements

  • Process Control System at Central Wastewater Treatment System

  • City-Wide Automation Improvements for Water Plant Sites

  • Wynnwood Pump Station

    Office Creek Pump Station Well #4 and Wynnwood Pump Station

  • Wilson Creek RWWTP Electrical Improvements